Tag Archives: Projects

Here’s to new adventures

The bag is empty, no cats here. Our move to Klamath Falls is now eminent!

Last week we put down a deposit on a nice little 2 bedroom, 2 bathroom house in the Altamont area of Klamath Falls. The original plan was to live in town for a couple of years while we build on the property we purchased back in June 2016. Over the course of the weekend, there was a rollercoaster of ups and downs emotionally but in the end, we were very happy with the results of the weekend.

The property we bought in 2016 is not going to be a good fit, but we have worked out the details and it looks like we won’t loose any money, or very little at any rate. We still have the capital we invested over the year to invest in another property a little farther down the road. Once we get established in KF we will start looking for a property for our forever homestead.

Back in April, we made the commitment to set some target dates for moving and finding work. The advantage of setting those dates was having targets to aim at. With a target in sight, we started packing the non-essentials early on to distribute the chore of packing. Last weekend we planned to go up to KF and look at a couple of rental properties with the hope of at least getting to know some of the realtors and property owners in the area. Actually finding a place was only secondary.

The Universe was smiling on us and we found a great little house with nice neighbors and a great property owner to boot. So, we came home renters for the first time in over 20 years. It’s been a very long time since either of us has lived in a house and nearly as long since we rented. Anyway, you look at it, we are in for an adventure.

Once we got home, the Universe continued to smile as we purchased a trailer kit and a bunch of accessories and paying several hundred dollars less than expected. I also was able to round up everything I needed in short order. The trailer is a lot like the one I purchased as a kit about 25 years ago after coming back to the area from rebuilding a house in Stockton. The assembly was about what I remembered with only a few changes. I got the entire frame up and structurally completed in two days. One more day and I should have it road ready with all of the electrical.

Next week I plan on wrapping up the electrical and getting started on the box which should only take a day or two. The good news is, I don’t need to have the trailer finished until June 30th. Come the first of July I will begin making trips up to the house. We will be all moved up by August first, which is good since that is when we need to be out of our apartment.

One of the things I am very much looking forward to is having a good radio antenna up for HF radio. I am also looking forward to having some room for woodworking projects. Who knows, I may even get to an aircraft build some time soon. I don’t know how all of these things are going to work out, but I am confident we will move forward in our goals.

Until next time,
~FlyBoyJon

More of not much

20150222_143627Holy crap! What do I write about…

It’s weird, I am in a strange head space right now. I have been thinking about a lot of projects I want to get going or moving forward on but it seems like the entire universe in in a holding pattern. I have aviation projects I want to get working on, radio projects, homesteading projects, building stuff, woodworking, furniture, the list goes on and on, but everything is on hold, well almost everything…

We have been working on putting together a bunch of projects of stuff for sale to try and get a crafting/restoration business going to start generating some funds before we make the jump to a new location but it sapping all our energy and some funds with not much in return as of yet.

What was once going to be a website for a completely different business idea has turned into our families crafting/restoration site VintageAeroWorks.com. We have been working on a bunch of projects and posting them on the site. We also have several projects we are just wrapping up to post over the weekend. All of my energies have been going to getting more build projects done.

While building all of this stock and working side-by-side with Tammy are is a good thing in theory, my head is spinning with all of the things that are on hold while I focus on this. Most of it is stuff that would be on hold anyway. I can’t justify starting any other projects that would require a lot of time or materials right before making a big move. It just wouldn’t make sense. I am trying to cut down the pile of stuff that needs to get moved, not add to it.

Keeping spending down to a bare minimum is also a priority, while still keeping up with what we need to spend money on to get the build projects done.

It’s all so tiring, and I can’t get my brain to switch off. It’s like having 100 projects all running at the same time but having 95 of them all waiting on some outside thing to happen befor you can go any further. You go through the list everyday and try to plan for the next phase of each and every one, but you can’t because that outside thing is a variable and the direction of the project hinges on that variable. 95 variables for 95 projects, all floating around in your head while you try to stay on top of all 100 projects and get that small 5 that you are not waiting on anything done.

Just thinking about thinking about it makes my head hurt. Welcome to my head, watch your step, mind the squishy bits.

The basic plan is for a land acquisition in May with a move date sometime around September. I don’t know if I can hold out that long. I’m relatively sure my perception is skewed, but it sure seems like the Stupid and Ignorant quotient is getting larger every day, and I’m finding my tolerance for it is in very short supply. Fortunately working from home keeps me out of the majority of it but even going out only a few times a week has become a very trying experience.

I guess I need some more shop time. 🙂

Till next time,
~FlyBoyJon

Another GREAT shop day

Two great shop days in a row, how awesome is that?

Another five hours today; that makes ten hours for the weekend. A fantastic way to wrap things up for the week, I think.

I started out the day by sanding the stern post core and preparing it for bonding the ⅛” skins to it. The T-88 did a great job bonding the edges of the core pieces together, and waxed paper works fantastic as a barrier and release paper. I hadn’t worked with T-88 before so this was a trial run for me. T-88 measures out and mixes up easily. The change from two components, clear and honey, mixing to a cream color when stirred together makes it really easy to tell when it is thoroughly mixed. The best part is the smell, or lack there of. I have been doing some work with polyester resins in my day job, and that stuff is really noxious. The T-88 is so easy to work with and so far I am really happy with its performance.

With the stern post core bonding to the skins and clamped up, it was time to move on to the firewall. First I had to remove the strengtheners from the original firewall which took a little longer than I had hoped for. Once all of the hardware was removed and the strengtheners separated it was time to mark out the new firewall. After marking out the cut lines I set up the table saw and did the rip and cross cut for the basic shape. The new firewall matched up perfectly with the old one.

I decided to clamp them together and used the old firewall as a drilling jig for the new firewall which worked out very well. The holes are really snug on the bolts so any misalignment would make life difficult at this point. Fortunately everything lined up spot on and bolted up cleanly. The counter-sink worked much better this time around. With everything torqued up, the bolt heads are just a couple of thousandths below the surface and they look great.

   

   

With the shape cut and the strengtheners attached I started setting up some test boards for the bevels. Both side edges of the firewall have an 8.5º bevel and the top has a 5º bevel. I was concerned about the set up and I wanted to make sure I didn’t hose the second firewall. After a few sample passes through the table saw I had the angle and distance from the fence set up just right. Time for the bevel cuts.

   

After the bevels where cut it was time to cut the parallel notches in the bottom for the firewall that will eventually accommodate the longerons. There are still several things to do on the firewall but it is well under way.

   

If next weekend comes even remotely close to this weekend in productivity I should be able to finish the firewall and maybe even get a good head start on the stern post, at least get the rough blank cut for the stern post. Looks like I need to get my ducks in a row as far as materials go for the spar bulkheads.

Until next time, blue skies and tail winds.
~FlyBoyJon

Keep moving forward!

As you may have guessed, the day job got in the way of my preferred interests making it hard to get anything done on the airplane. But, now I’m back in the shop going over the construction plans trying to decide where to begin. Most builders seemed to start with the empennage. Building the vertical stabilizer and the horizontal stabilizer first. Because of my shop’s space limitations, I’m thinking about starting with the bulkheads; building the firewall bulkhead, forward spar bulkhead, aft spar bulkhead, and lastly the stern post.

VP-2After the bulkheads are built I can do a temporary fit of the cabin, building the seat components and cabin floor structure without permanently affixing them to short, temporary longerons. I can’t build the completed fuselage just yet, there is just nowhere to put it. Next I can move on to wing ribs, horizontal stabilator ribs, and vertical stabilizer ribs. With all of the ribs cut I can go ahead and start building larger assemblies. I should have enough room to easily store the completed vertical stabilizer. Then I can move on to the horizontal stabilator spar and the stabilator itself.

With the empennage components completed I can move on to other assemblies, forwards spars, aft spars, fuel tank, control stick, landing gear and such. By the time I get to this point, I should have access to a larger space for fuselage construction then I can put it all together. At least that is the plan for now.

As I’m sure you figured out by now, because of my space limitations I am looking to build flat components first, then flat and/or small assemblies. This should keep my space requirements to a minimum until absolutely necessary for the fuselage. The longer I can keep the build in a small space the better.

On another subject, I have been reconsidering the model this last week. The paper laminates that I planned on using as plywood substitutes for the 1:4 scale model just don’t provide enough structural support or hold shape well enough for me to consider them viable, especially the two-ply and four-ply laminates. I had thought about purchasing some balsa materials in the proper size but I almost fell over when I saw how expensive balsa wood has gotten. Another problem is the mechanics of milling small pieces of material from Douglas fir. That being said, I have decided to go with the VP-2 rather than the VP-1 and build it as a single place instead of a two-seater. Because I don’t need to compare the airframes, I don’t really need to do the model. If I run into a problem I can always model the assemblies involved if I need a solid reference.

Following the plan outlined above and building the bulkheads first all I should need to put together right now is a materials list for the bulkheads, source it out and figure what my cost are going to be. I already have some of the Douglas fir and I know where to get everything else I need, so this should be little more than an academic exercise, until I start making saw dust anyway. Oooo… sawdust… I am really looking forward to building.

Until next time, blue skies and tailwinds.
~Jon

Back on track

Greetings Intrepid Aviators,

The last few days have been plagued with zombies; no seriously, take a look . Now that the zombie menace has been put down for the year, they will be back next year, it’s time to get back on track with the matter at hand, building an airplane.

Nothing new has been done on the 1:4 scale since last week, but I have had some thoughts on the matter. I think making the paper laminates in smaller sections rather than the 24” x 12” pieces I planned on, using thinned glue, and pressing the material with more weight should help make the resulting material a high quality substitute for very thin plywood. This week I am going to focus on the laminate first and then if all is going well I will get started milling the lumber materials from the Dough Fur I purchased last week.

VP-2Another task for this, and the next few weeks is to dive into the plans in much more detail. I have looked over both the VP-1 and VP-2 plans but I have not really focused on them in detail or thought about what assemblies to begin with. I am considering picking up a large drawing pad and redrawing the plans so that all of the details for a sub assembly will be presented on a single sheet. I like to study the details of drawings and plans by reproducing them by hand. The process helps create 3D models of each piece and assembly and how they interrelate with other parts. It gives me a clearer vision of the entire plane and all of its component parts. By redrawing the plans I will also be able to come up with a complete parts list, assembly parts lists, work operations list by assemblies, and other useful administrative minutia that should make the build go smoothly for me. A side benefit is taking the time to include the 1:4 scale dimensions in parenthesis alongside the full scale dimensions.

All of this may sound like it is complete over-kill, and it may be, but it’s how I work. I like to plot out all of the details and have contingencies for problematic areas. It comes from decades of working with non-profit groups and producing events. Even though I have been harassed mercilessly for taking so much time in planning to the smallest detail, everything works out smoothly even in the face of adversities most of the time. It is an attitude thing, too. When running an event, it is easy for panic and frustration to kick in when something starts to turn south, particularly during the event. It’s all about focusing on solving the problem at hand, removing the cause, and smoothing out the bumps. Oh, and doing it all behind the scenes without the general public knowing it happened at all. All in a day’s work as they say.

Blue skies and tailwinds,
~Jon

Materials

Got out this morning and did another material sourcing run. It didn’t go as well as I had hopped, but that’s okay. I have made some solid decisions on materials and can now start buying what I need for the 1:4 scale project, as well as buying materials for the full scale airplane. Full steam ahead!

Full Scale

First and foremost, I’ve been able to source a majority of wood products locally. However, it looks as though I will have to run with one of the regular aviation suppliers for the 1/16″ plywood. I can find 1/4″ and 1/8″ but that’s as thin as local suppliers carry. 1/4″ AA marine is relatively easy to find, 1/8″ is tougher, 1/16″ is nearly impossible in any grade.

I found a local source for aircraft cables of the mechanical control variety; not electrical, which I suppose would be obvious to anyone who has been reading this blog since I don’t plan on installing an electrical system in the airplane. It looks like Orchard Supply carries aircraft cable as a regular item.

A local supplier for composite materials is TAP Plastics. I had a feeling it wouldn’t be particularly difficult getting some of the composite supplies locally. They don’t have all of the right fabrics, but they do have some. I am not sure about the resin and epoxy they stock, but for the basic materials to work with them, well those they have in spades. I will check out the chemical stuff later when I get to a point that I actually need to think about composites.

1:4 scale

I am rapidly coming to the conclusion that I will need to manufacture the ply products I need. The lumber is readily available, ply products on the other hand… With the full scale ply sizes being 1/4″, 1/8″, and 1/16″ the 1:4 sizes are 1/16″, 1/32″, and 1/64″ respectively. As I said earlier in this post, it is tough if not impossible to find ply this thin anywhere locally. So, I have resigned myself to the arduous task of manufacturing a replacement material.

At this point I think it will be a laminated paper product. Layers of a a heavy water-color paper should do nicely, maybe a 25 sheet pad. With any luck the end product will be moderately stiff ply-board in the appropriate thicknesses. In 1:4 scale a 4’x8′ sheet of plywood is only 1’x2′ so it shouldn’t be difficult to find the paper stock large enough. I was thinking of using Gorilla Glue as the laminating adhesive mainly because it is very strong and you can use water to thin it for spreading a very thin layer evenly across the surfaces of the laminates. I was hoping to avoid this but ya gotta do, what ya gotta do.

Composites

In truth the only composite parts that I would need to build are the engine cowling and the turtle-deck faring which isn’t even a required part, though, I must admit, I am definitely warming up to the idea.

The EAA Chapter 62 meeting I mentioned in the last post got me thinking about composite materials and processes. I haven’t done any fiberglass work in a long time but that is going to change with a day-job project that I recently started. It has some fiberglass work that needs to be done, so I figured I could brush up on those skills and maybe put some of the new techniques into action.

I purchased a book on fiberglass repair and construction to refresh the old gray matter on the subject. It has nothing to do with aviation but it is all about the basic skills for fabrication and repair in the medium. The book was published in 1988 so some things might be a little different or out of date material-wise, but the skills should transfer reasonably well.

Till next time, blue skies and tail winds,
~FlyBoyJon

Aircraft Grade

Greetings Aeronauts,

This week has been interesting. In Monday’s post I talked about getting a copy of the VP-2 plans and the idea of building both the VP-1 and the VP-2 in 1:4 scale to compare the plans. Looks like I will begin working on an airframe sometime next week. I am really looking forward to start actually building. This weekend is jammed with Grave Mistake workshops and the Step Out: Walk to fight diabetes 5k that my wife and I participate in every year along with some friends.

Throughout the week I have been interacting with the great people in the Volksplane Yahoo Group and the fine folks at Oshkosh 365. I got several replies when I asked for some advice on adhesives for wood aircraft. The plans call for Aerolite which does not appear to be readily available. For the most part I got a lot of thumbs up for T-88. Other suggestions included, Aerodux which is a Resorcinol Formaldehyde Adhesive like Cascophen, and West System Epoxy. I am not sure which one I will go with but I am leaning toward the T-88. I need to get the MSDS for each of them as well as take a look at volume, weight, coverage, and relative strength comparisons, and yes, the cost comparison, too.

Another question I had was about Certified Aircraft Grade Lumber. It looks like there ain’t no such animal. In short, your aircraft lumber supplier checks the material to make sure it meets the standards of Aircraft Grade, those standards being MIL-S-6073 Military Specification, Spruce, Aircraft, MIL-P-6070B Military Specification, Plywood and Veneer Aircraft Flat Panel, ANC-18 Design of Wood Aircraft Structures, and of course the standards set in AC-43.13 1B Maintenance & 2B Alterations Aircraft Inspection, Repair & Alterations. They inspect the material, stamp it, and price it accordingly. It is not a federally recognized certification, it is a voluntary compliance to Military Specifications set back when the military used wood aircraft, with a little updating now and then. Don’t take that to mean that I think it’s all hokum; I don’t. The standards are there because they are appropriate to the application. If you are not sure how to grade lumber or are not sure if you can determine compliance reliably, buy lumber from someone who can make those assurances!

While Sitka Spruce is the de facto aircraft lumber, it is not the only species used. The main factor in choosing wood other than structural strength is grain, vertical grain (VG) to be precise. A VG Clear Douglas Fir (DF) is one of the closest quality woods to Sitka Spruce, in fact it is stronger than the spruce in most respects. The drawback with DF is its weight; DF runs about 26% higher in weight than Sitka. In this aircraft, a majority of the structural weight is in the plywood and not the lumber, so the impact on gross weight using DF instead if Sitka should not be that much. Without an electrical system, using minimal instruments, and other weight saving details like single occupant controls, I think the trade-off in favor of structural strength is reasonable, even wise, not to mention that as a Pocket-Change Builder I can’t overlook the cost of DF being significantly lower than Sitka. Having a supplier less than 20 minutes away doesn’t hurt.

Most likely I will end up going with the VP-2 airframe. It is intended for a higher gross weight and a higher useful weight. With two occupants taking up 170 pounds each, that gives me 340 pounds to work with as a single pilot. While I won’t need all of that, I sure as heck am not under 200, nor have I been since 6th grade. I wrestled in the 220 class in Jr High. The extra airframe strength and the VP-2 load capacity provide a significant safety margin over the VP-1 design which is why I am leaning in that direction.

Something fun thing to add to this week was my first EAA Chapter meeting. There are two chapters here in San Jose with a couple of others less than an hour away giving me a lot to chose from as far as finding a good fit. Thursday night was Chapter 62’s monthly meeting. I am not sure if I am going to join 62 yet, but I did have a good time there. The chapter is more of a flying and activities chapter than a building chapter. As it turned out, last night was a great night for me to go to a meeting there because the speaker was Zeke Smith, author of Advanced Composite Techniques.

Zeke demonstrated his process for vacuum forming a leading edge to be used on an an ultralite project. The end product has a thin outer skin and foam strengthening with plenty of room for similarly light ribs. I was amazed at the strength of the leading edge without any support and the incredibly light weight. If I was working on a composite project I would be buying this book right now. I may still get it for this project to use his techniques to form the engine cowling and turtle deck of the VP. That might even give me more weight advantage for the DF…

Only slightly off topic, I can easily see myself building a composite VP-2. In fact I can see some of the layups for Zeke’s vacuum process in my head now. To quote Red Leader Stay on target.

For anyone interested in helping out the FlyBoy, I need to get a print copy of AC-43.13 1B/2B. Contributions to the Pocket-Change Builder’s Fund are always greatly appreciated.

Until next time, blue skies and tailwinds,
~FlyBoyJon

Plans in Hands

The workshopThursday was a pretty good day. First off, I managed to get down to the workshop and finish cleaning up. I remodeled the shop about a month a go and have been moving everything back in ever since. Because it is such a small space it has taken a lot longer than I had hoped it would to get everything organized and stowed. There are still a few containers that need some sorting, and I need to add a couple more of those small-parts bins, but all-in-all it is a usable space once again.

When I did the remodel I included an internet connection for parts look-ups, ordering, reference materials, and to have some audio visual stuff available. One thing I haven’t gotten around to just yet has been the installation of ventilation fans. It is a really small space and it gets hot in there really fast. Besides, if I am going to use any resins, do any soldering, blah blah blah, it would be a good idea if I had some air-flow.

A package? For me?On Tuesday I placed an order with Aircraft Spruce for some stickers, a patch, and… my set of Volksplane VP-I plans. My wife and I had something going on Thursday night which just happened to be when I was expecting Mr. UPS Man to come by with my package containing the plans. I was hoping that he would come early so I could take the plans with me, but time was growing short and we were about to head out. I was writing a note to authorize my son to accept the package for me when low and behold, who should appear? Mr. UPS Man! Package in hand, we were out the door in a couple of minutes.

My wife and I run a group called Grave Mistake. The group participates in the annual “Thrill The World” world-wide simultaneous Thriller dance event. My wife teaches the Thriller dance and I take care of the audio as well as manage the web and back office stuff for the group. So while she was teaching Thursday’s dance workshop, I was reading; well flipping through. I perused my way through the “VP-I Volksplane Plans and Pilot’s Handbook” and the “Evans Lightplane Designer’s Handbook” before the workshop ended.

VP-I plans and HandbookThe plans are on 8.5″ x 11″ sheets in a comb-bound volume. Everything is there but a lot of it is crowded on to the sheets and doesn’t seem to be organized in what I would consider a logical order. Looking at the plans a little closer now that I am home, I am thinking I need to make some copies and lay everything out so I can look at it all with my Big Picture eyes. I might need to do some blow-up prints too. I will definitely need a couple of working copies to make notes on.

While my wife and I were driving to the dance workshop I was talking with her about possibly building a 1:4 or 1:8 scale model using veneer sheets and pine. At 1:4 scale I might be able to build it from one (1) or two (2) sheets, and two (2) or three (3) pine 2″ x 4″s. Looking at the plans, I’m thinking it might be a really good idea. If nothing else it will be a good way get really familiar with the plans, and if I screw something up it wont cost me hundreds of dollars. Another good thing about building the model is that it will give me a better idea what materials will be needed for jigs, fixtures, and tooling. By building a model I should be able to prevent time and money consuming problems, and I will have a better understanding of the airplane over all. I will also end up with a really cool scale model to boot!

Looks like I have some planning and shop-office stuff to get done. I need to come up with a task list and sub-budget for the model. I think I might need to build a bench-top frame for my RotoZip tool to use it as a router/cutter for the model. I have some 1/4 and 1/2 particle board, some cheap 1/4 plywood, and some Masonite available, and lots miscellaneous hardware. That should get me started. The next two weeks are really full, but I will find some time to get some work done and report back to you.

Until next time, blue skies and tail winds.
~FlyBoyJon

Oops.

Holy Cow!

I didn’t realize how long it had been since I posted on the blog. You may remember I am producing a local live event project. Nothing huge, but for some reason it has been sucking my time away in unbelievable volumes. To get this project off the ground I had to build a support infrastructure before building the actual “group” that is doing the event. The basics are not difficult, I do this kind of stuff all the time, the time killer is having at least one workshop every week and all of the back office stuff going on as well.

Needless to say, I’ve been busy. Oh, and did I mention this is a no money gig. Don’t get me wrong, I love every minute of it. I have been doing tons of web development stuff that will carry over to other projects and a fair amount of media work too. The only real problem has been pulling myself away from the gig to do my “day job” stuff, as I said no $$$ for the gig.

Here is the really funny part. While doing all of the gig work, and the “day job”, I have been getting tons of creative ideas that I have been scrambling to get written down. Not that I have had any time for writing mind you.

With any luck things will begin to normalize before the end of the month. The event is on the 24th and the editing shouldn’t take too long. The live event is only 6 minutes, with that and all of the before material I have been compiling I am hoping to have a solid 30 minute short Doc when all is said and done. At least when I get to post, it will all be on my own time and not a schedule so I can take a breather when needed. For now, time is fleeting.

Until next time,
~FlyBoyJon

Building A Production Team

Howdy all!

This is going to be a short post today, I am totally wiped out tonight but I wanted to get this out right away. I will be refining this post and building a Team Search page later but for now I will get to the guts of the matter.

FlyBoyJon is building a creative team. I have a couple of projects in early development and I need to get them moving forward, so I am looking for some pre-production development talent to start building that creative team. I am looking for… Director, Director of Photography, Editor, Production Designer, Visual Effects Supervisor, and Writer. This is not an exclusive list however, anyone in production is welcome to contact me.

In the interest of clarity I wanted to be sure to let you know that this is not an open job listing. I am looking to connect with more of my fellow production people. If something comes from connecting, fantastic. If not, we will have exchanged some information and maybe be able to work with, or help each other out in the future. This is an open invitation to network with fellow production people.

If you are interested, feel free to send me an email or you can leave a message for me by using the Call Me button up on top of the page. Please remember to send/leave your name, contact information, what you do, and any other information you think relevant or important. I am looking forward to hearing from you.

I am also looking to meet up with fellow producers in the San Francisco/Silicon Valley area so please feel free to drop me a line or email anytime.