Tag Archives: Aircraft Spruce

Firewall Bulkhead

Firewall BulkheadGreetings all you aviation types out there!

After much debate, a few false starts, and some gnashing of teeth, I am actually starting to build the real full-scale VP-2. I was looking for the least expensive assembly to get the ball rolling and decided to start with the bulkheads. The firewall bulkhead seemed like as good a place as any to start. There are a some good reasons to start here too, first off it is frequently station 0 for all of the location references and weight and balance data. The firewall is also the forward most airframe structure, and this assembly doesn’t require any “aircraft grade” lumber in its construction.

There are of course other aircraft grade materials needed for the assembly, but they are relatively inexpensive. In this case it is 10 bolts with corresponding nuts and washers. I ordered the bolts, nuts, and washers from Aircraft Spruce on the 29th, and I already have the doug fir. All I need to do is pick up “a good sound piece of (3/4“) D.F. exterior ply”.

With hardware en-route (I expect it this afternoon!), board lumber in hand, and plywood a short drive and a few bucks away, I started studying the fine details of the firewall bulkhead assembly. I have been going over the plans for the bulkhead with a fine-tooth comb looking at every minute detail, arc, and dimension. This bulkhead is solid unlike the forward and aft spar bulkheads or the stern post. The other bulkheads all have doug fir and white pine cores with aviation plywood (1/4” and/or 1/8“) webs. The firewall is a slab of ply with doug fir reinforcing members bolted on the aft starboard and port sides.

A challenge presented itself with the hardware specifications. The bolts were spec’d on the plans, but the washer and nut were not. With a little detective work I found a vague reference in the “General Assembly Procedure” text in the back of the plans set. The only references to the firewall bulkhead don’t say anything about what hardware is going to be used. There is a brief note that lists a few pieces of hardware but it has no references to assemblies so you are left to your own devices to figure it out. I found the reference after looking up hardware in the Aircraft Spruce catalog and figuring it out there. There needs to be an updated, cohesive plans set for newbies without aeronautical engineering degrees. After I take an AutoCAD class or two I think I’ll get on that.

On several occasions I have heard that when building an airplane on your own you should try not to look at the Big Picture too often. Taking the construction one assembly at a time and looking at the Big Picture only when between assemblies to decide what to do next and for interconnectivity issues. I have been scouring over the whole plans book in detail for a while now and I am starting to see the whole as a collection of smaller independent projects.

I can see now why a lot of builders that jump in feet first without a lot of thoughtful review find themselves feeling in over their heads after a while. I can also see how experienced builders can switch from one area of the aircraft to another or have a couple of completely unrelated assemblies going at the same time. It seems that the secret to keeping a project going and making regular and significant progress is that ability to compartmentalize the structure and focus only on the areas that are currently in progress and always have something to work on. Keeping build time for focused building and planning time for the strategic organizing and advance ordering of materials that may take a while to arrive. The whole process is really three distinct jobs. The Project Manager, the Materials Procurement Specialist, and the Builder/Mechanic. For a project to be efficient and run like a well oiled machine a builder has to keep all of those jobs going independently and up to date while keeping it all synchronized.

As the project manager I have been reading the AMT handbooks and scouring the internet for various upgrades/mods for the VP-1/2. Yesterday I found some drawings from builders for things like landing gear mods, break systems, various trim devices, canopies, fairings, and more.

As the Materials Procurement Specialist I think it’s time to head out an buy a piece of 3/4” plywood, that is if I want the Builder/Mechanic to have something to do tomorrow.

Until next time, blue skies and tailwinds!

~FlyBoyJon

ETA: The delivery came from Aircraft Spruce while I was out picking up the plywood so everything is in place for a sawdust party tomorrow.

Post Holiday Ramp-Up

PlanningGreetings fellow aeronauts, intrepid adventurers, and aviation enthusiasts,

The holiday season is a busy time of year for just about all of us. With all of those family, friend, and work related events and engagements that need your personal attention, not to mention all of the holiday shopping for food and gifts, its a miracle we get anything else done! And after all of that is over there is still all of the after-holiday sales which have become such a big part of the seasonal consumer madness that seems to afflict us all.

For years now my family and I do our best every holiday season to stay clear of the holiday shopping blitzkrieg as much as possible.  We trying to keep pretty much all of our shopping to a minimum from just before Thanksgiving until after the New Year. One thing I did brave the wilds for was to get over to the home drome and my favorite local pilot supply emporium The Airport Shoppe at Reid Hillview Airport (KRHV) here in San Jose.

Remove Before FlightI have been in need of some reference materials for the hanger bookshelf and over the course of several visits this the month I managed to gather together a few of the important ones. AC-43.13, the 2011 FAR/AMT, the 2011 FAR/AIM, and all three of the aircraft mechanics handbooks, General (FAA-H-8083-30), Powerplant (AC-65.12A), and Airframe (AC-65.15A). I also picked up a new Remove Before Flight key tag, my old one was getting a bit rough around the edges.

Another acquisition over the holiday was a licensed copy of AutoCAD 2011. Autodesk has a great student license program that grants a three year license for several of its products to enrolled students. Now, I don’t have a clue about using CAD software, but I do know I want to reproduce my aircraft plans in a CAD format. With the plans in an editable digital format it will be a lot easier to produce accurate notes and diagrams for any changes that may come up as well as keep track of individual component parts, assemblies, and materials for said parts and assemblies. There are some AutoCAD classes that I can take at SJCC or Evergreen but my class schedule is full for this term so I will have to see if I can get into a summer or fall semester class. Knowing CAD would most defiantly be a boon for my build projects, and it certainly won’t hurt my educational and career goals ether.

Next on the list of things to do is actually getting some materials and start making some sawdust. Depending of how this years tax return works out, I just might be able to make a trip down to Corona in February for a plywood and spruce shopping spree. I just need to scrape together enough materials money to make the seven hour road trip worth while.

Until next time, blue skies and tailwinds!

~FlyBoyJon

Plans in Hands

The workshopThursday was a pretty good day. First off, I managed to get down to the workshop and finish cleaning up. I remodeled the shop about a month a go and have been moving everything back in ever since. Because it is such a small space it has taken a lot longer than I had hoped it would to get everything organized and stowed. There are still a few containers that need some sorting, and I need to add a couple more of those small-parts bins, but all-in-all it is a usable space once again.

When I did the remodel I included an internet connection for parts look-ups, ordering, reference materials, and to have some audio visual stuff available. One thing I haven’t gotten around to just yet has been the installation of ventilation fans. It is a really small space and it gets hot in there really fast. Besides, if I am going to use any resins, do any soldering, blah blah blah, it would be a good idea if I had some air-flow.

A package? For me?On Tuesday I placed an order with Aircraft Spruce for some stickers, a patch, and… my set of Volksplane VP-I plans. My wife and I had something going on Thursday night which just happened to be when I was expecting Mr. UPS Man to come by with my package containing the plans. I was hoping that he would come early so I could take the plans with me, but time was growing short and we were about to head out. I was writing a note to authorize my son to accept the package for me when low and behold, who should appear? Mr. UPS Man! Package in hand, we were out the door in a couple of minutes.

My wife and I run a group called Grave Mistake. The group participates in the annual “Thrill The World” world-wide simultaneous Thriller dance event. My wife teaches the Thriller dance and I take care of the audio as well as manage the web and back office stuff for the group. So while she was teaching Thursday’s dance workshop, I was reading; well flipping through. I perused my way through the “VP-I Volksplane Plans and Pilot’s Handbook” and the “Evans Lightplane Designer’s Handbook” before the workshop ended.

VP-I plans and HandbookThe plans are on 8.5″ x 11″ sheets in a comb-bound volume. Everything is there but a lot of it is crowded on to the sheets and doesn’t seem to be organized in what I would consider a logical order. Looking at the plans a little closer now that I am home, I am thinking I need to make some copies and lay everything out so I can look at it all with my Big Picture eyes. I might need to do some blow-up prints too. I will definitely need a couple of working copies to make notes on.

While my wife and I were driving to the dance workshop I was talking with her about possibly building a 1:4 or 1:8 scale model using veneer sheets and pine. At 1:4 scale I might be able to build it from one (1) or two (2) sheets, and two (2) or three (3) pine 2″ x 4″s. Looking at the plans, I’m thinking it might be a really good idea. If nothing else it will be a good way get really familiar with the plans, and if I screw something up it wont cost me hundreds of dollars. Another good thing about building the model is that it will give me a better idea what materials will be needed for jigs, fixtures, and tooling. By building a model I should be able to prevent time and money consuming problems, and I will have a better understanding of the airplane over all. I will also end up with a really cool scale model to boot!

Looks like I have some planning and shop-office stuff to get done. I need to come up with a task list and sub-budget for the model. I think I might need to build a bench-top frame for my RotoZip tool to use it as a router/cutter for the model. I have some 1/4 and 1/2 particle board, some cheap 1/4 plywood, and some Masonite available, and lots miscellaneous hardware. That should get me started. The next two weeks are really full, but I will find some time to get some work done and report back to you.

Until next time, blue skies and tail winds.
~FlyBoyJon